Electrical Panel Upgrade in Ontario: The Complete 100A to 200A Guide

Elevation: existing 100 A panel and the upgraded 200 A panel with a new meter base

Your 100A panel was installed when the biggest electrical load in the house was a toaster. Today you need EV chargers, heat pumps, and home offices — and the math doesn’t work anymore. Here’s what a proper upgrade actually involves.

Why Upgrade from 100A to 200A?

Ontario homes built before 1980 typically have 100A service — sometimes even 60A. This was adequate for the era, but modern electrical demands have fundamentally changed:

LoadTypical DrawImpact on 100A Panel
Level 2 EV Charger30–50A (240V)Uses 30–50% of total capacity
Electric Range/Oven40–50AUses 40–50% of total capacity
Central A/C20–30AUses 20–30% of total capacity
Heat Pump30–60AUses 30–60% of total capacity
Electric Dryer30AUses 30% of total capacity
Hot Tub / Sauna40–50AUses 40–50% of total capacity
The math is simple: A typical Level 2 EV charger (32–40A) + central A/C (25A) + electric range (40A) = 97–105A of connected load on a 100A service. That’s before you turn on a single light.

7 Signs You Need a Panel Upgrade

  • Breakers trip frequently — especially when multiple appliances run simultaneously
  • Fuse panel or older breaker panel — screw-in fuse panels and some older breaker panels (e.g., Federal Pioneer Stab-Lok, Zinsco) are often flagged by inspectors and insurers
  • Adding EV charging — Level 2 chargers typically require 30–50A dedicated circuits at 240V
  • Renovation or addition — basement apartments, additions, or kitchen remodels
  • Double-tapped breakers — two wires on a breaker terminal not rated for two conductors = code violation
  • Insurance requirement — many insurers won’t cover homes with 60A/100A fuse panels
  • Real estate transaction — home inspection flagged the panel

CEC & OESC Requirements

A panel upgrade isn’t just swapping a box. The Canadian Electrical Code (CEC) and Ontario Electrical Safety Code (OESC) mandate specific requirements:

RequirementReferenceDetails
Minimum service sizeCEC Rule 8-200Calculated load, but not less than 100A for 80 m² or more of living area (60A below 80 m²); the former OBC 200A EV-ready provision (O. Reg. 139/17) was revoked in 2019
Demand calculationCEC Rule 8-200Single-dwelling calculation: 5000W basic load for the first 90 m² + 1000W per additional 90 m², plus heating/A/C, range, EVSE and 25% of other loads over 1500W
Service conductorCEC Rule 4-0063/0 AWG copper (75°C column, per termination rating) for 200A
Grounding electrodeCEC Rule 10-102Grounding electrode system required; may include ground rods, a metallic water pipe (in-situ electrode), or a concrete-encased electrode
AFCI protectionCEC Rule 26-658Required on dwelling-unit receptacle branch circuits (with listed exceptions); per ESA Bulletin 26-29-6, not retroactively required on existing circuits during panel swap if no new receptacles added
Panel clearanceCEC Rule 2-3081m working space in front of panelboard, at least 1m wide (or the panel width, if greater), 2m headroom

For a detailed breakdown of demand calculations, see our Load Calculations & Transformer Sizing guide.

The Upgrade Process Step-by-Step

StepWhoTimeline
1. Load assessmentLEC; P.Eng where requiredDay 1
2. ESA permit applicationLicensed Electrical Contractor (LEC)Day 1–3
3. LDC notificationLEC coordinates with utilityWeek 1–4 (Toronto Hydro: 10 business days initial review)
4. Utility disconnectLDC (Toronto Hydro, Hydro One, Alectra)Scheduled day
5. Service mast & weatherheadLECSame day
6. New panel installationLECSame day
7. Grounding electrodeLECSame day
8. ESA inspectionESA InspectorBefore reconnection (book in advance)
9. Utility reconnectLDCAfter ESA approval
Important: The home is without power from Step 4 until Step 9 — typically 1–2 days. Plan accordingly. For utility coordination details, see our Toronto Hydro Connection Guide.

ESA Permits & Inspections

In Ontario, most electrical work, including every panel or service upgrade, requires an ESA notification (permit). This is not optional — it is provincial law under the Electricity Act.

  • If hiring someone, they must be a Licensed Electrical Contractor (LEC)
  • ESA inspection is mandatory before the utility will reconnect
  • A Certificate of Acceptance is issued upon passing inspection
  • Homeowners can do their own electrical work with an ESA notification, but panel upgrades involve live service conductors — strongly recommend hiring an LEC

For more on the permit process, see our Ontario Electrical Permit Guide.

What Affects the Cost?

Panel upgrade costs vary significantly based on several factors. Rather than quoting a specific number (which would be misleading), here are the variables that drive the price:

FactorImpact
Service mast replacementRequired if existing mast is undersized for 200A conductors
Meter base upgrade100A meter base must be replaced with 200A rated base
Underground vs. overheadUnderground service upgrades cost significantly more (trenching)
Grounding systemOlder homes may need new ground rods and water pipe bonds
Number of circuitsMore circuits to transfer = more labor
AFCI breaker requirementsAFCI may be required on new or extended receptacle branch circuits per OESC 29th Edition (CEC 2024); not retroactively required on existing circuits during a panel swap (ESA Bulletin 26-29-6)
Asbestos or vermiculiteOlder homes may require hazmat assessment before work begins
LDC requirementsSome utilities charge reconnection or infrastructure fees
Get accurate pricing: The only way to know the true cost is a site assessment by a Licensed Electrical Contractor. Request a free consultation from ETEM Engineering.

When Do You Need a P.Eng?

Not every panel upgrade requires a Professional Engineer. Here’s when you do:

ScenarioP.Eng Typically Required?Why
Simple 100A → 200A residential swapNoLEC can typically complete load calculation, ESA notification, and installation
Service upgrade above 200AOften / LDC-dependentLarger services may require LDC load summary, drawings, or sealed letter; OESC plan review applies at ≥600A 1Φ or ≥400A 3Φ
Adding secondary suite / ADUDependsBuilding permit and municipality requirements vary; designer/BCIN or P.Eng may be required
Commercial panel upgradeLikely yes / DependsMinor work may only need LEC + ESA notification; larger services, permit drawings, or plan review may require P.Eng
Multi-unit residentialOftenMetering, demand calculations, service distribution, and permit submissions are commonly engineered

For more details, read our P.Eng Stamp Requirements in Ontario article.

Frequently Asked Questions

How long does a panel upgrade take?

The physical installation takes about 1 day. However, LDC coordination (disconnect/reconnect scheduling) and ESA inspection add significant time. Toronto Hydro contacts you within 10 business days and cites a typical isolation lead time of about one month. Plan for several weeks from application to energization, depending on your utility.

Can I upgrade from 100A to 400A?

Technically yes, but residential services above 200A are less common and require a detailed load calculation, LDC approval and, in Toronto, an underground supply (Toronto Hydro’s residential maximum is 400A). The utility may need to install a larger transformer.

Do I need a panel upgrade to install an EV charger?

Not always. A P.Eng or LEC can perform a load calculation to determine if your existing panel has capacity. Many 200A panels can accommodate an EV charger. A 100A service may also work with an energy management system (OESC Rule 8-500) or a demonstrated-load calculation (Rule 8-106). See our EV Charging Guide.

Is a panel upgrade covered by home insurance?

No — a panel upgrade is a home improvement, not an insurance claim. However, upgrading from a fuse panel or Federal Pacific panel may reduce your insurance premium or resolve coverage denials.

What is a Federal Pacific panel and why is it a concern?

In Canada, Stab-Lok panels were sold under the Federal Pioneer name (the Canadian counterpart of US Federal Pacific Electric) and were widely installed in Ontario homes. Independent testing, mainly of US Federal Pacific equipment, has raised concerns about breakers failing to trip under overload conditions. There has been no general recall of the panels (only limited recalls of specific breaker models), but many insurers and inspectors recommend an assessment or replacement.