Electrical & Mechanical Engineering in Richmond Hill.

Electrical and mechanical engineering for Richmond Hill commercial, medical, institutional, office and multi-residential projects.

Electricity distributor
Alectra Utilities Corporation
Building permits
Building Services Division, Planning and Regulatory Services (City of Richmond Hill)
Regional services
York Region

Local Project Support

MEP planning for Richmond Hill renovations and growth.

Richmond Hill projects often involve commercial and professional space, medical uses, institutional facilities, multi-residential development and renovations to occupied properties. Ceiling coordination, equipment access, service capacity and life-safety changes should be resolved against controlled architectural backgrounds.

Where a building permit is required, the City of Richmond Hill administers the municipal review. Electrical service connections or upgrades may involve Alectra Utilities; the project address and current connection requirements should be confirmed before the design basis is finalized.

Project teams can review our MEP engineering support for architects and the concept-to-construction coordination checklist.

Verified local information

Utility connection and permits in Richmond Hill

Summarized from the official pages linked below, checked on . Requirements change; confirm them with the utility and the municipality before you apply.

Electrical service connection

Alectra Utilities Corporation

Alectra's company overview lists Richmond Hill among the 17 communities it serves.

Alectra's Conditions of Service list Richmond Hill within its licensed service area and refer to its distribution licence for exact boundaries.

Alectra's Conditions of Service say customers must apply in writing for new or upgraded services and consult Alectra on supply availability, voltage, service location and metering before designing a service.

Alectra's FAQ notes that reporting electrical work to the ESA is separate from getting a building permit, and a project may need both.

Alectra has applied to the Ontario Energy Board to merge its legacy rate zones into a single Alectra-wide rate zone starting in 2027.

Rate zone: PowerStream Rate Zone.

What to prepare

  • An online application through the Alectra Utilities New Connections Portal
  • Project details and expected project timing
  • Customer and electrical contractor details, plus property owner information
  • Technical requirements for the service, with electrical drawings or site plans where needed
  • For generator installations, technical specifications submitted with the application
  • For service upgrades, an Alectra account in good standing
  • An ESA inspection: Alectra must receive the Electrical Safety Authority's connection authorization before connecting or reconnecting a service

Building permits

Building Services Division, Planning and Regulatory Services (City of Richmond Hill)

Online applications: Permit Portal (permits.richmondhill.ca), linked from the City's 'Building Permit - Apply and Pay Online' page.

Richmond Hill's Part 3 Permit Application Process checklist (C1) asks for P.Eng.-stamped mechanical drawings (HVAC duct design, heat loss and heat gain calculations, plumbing and drain layout, roof-mounted equipment) and electrical drawings (lighting, power, emergency lighting, exit signs, and fire alarm drawings with riser details). It also lists sprinkler drawings, a site servicing permit application and, for new buildings and additions, energy efficiency forms signed and sealed by the designer.

The City's Non-Residential Permits page lists its Mechanical Unit Data Sheet, which the design engineer fills out for every rooftop unit installation, and its Plumbing and Drain Worksheet. For online uploads, each discipline's drawings go into one unprotected, single-layer, black-and-white PDF named as the City lists (for example Mechanical.pdf or Sprinkler.pdf), drawn at a scale no smaller than 3/16 inch to 1 foot; scanned printouts are not accepted.

By-law 38-25, as amended by By-law 114-25, makes all of Richmond Hill a Site Plan Control Area, covering new construction and additions or modifications to industrial, commercial, institutional and mixed-use developments. The C1 checklist lists an executed Site Plan Agreement, where applicable, as a pre-approval needed when the building permit application is made, and it is uploaded online as Agreement.pdf.

York Region

York Region requires its own permit for any work on Regional roads (such as a new or changed entrance), and Richmond Hill's building permit submission list asks for a York Region document where a property has entrances from Regional roads.

Planning and growth areas

  • Richmond Hill Centre, the intensification area around Yonge Street and Highway 7, is planned as the city's new downtown and transit hub; its Secondary Plan (OPA 41) has been in effect since January 17, 2025.

    Source: richmondhill.ca
  • The City's Community Improvement Plan is designed to encourage new office development, and its Building Renovation Grant Program supports the reuse of existing industrial, commercial or other buildings as offices in the Newkirk and Beaver Creek business parks, as well as in the Village and Oak Ridges Local Centres.

    Source: richmondhill.ca
  • Official Plan Amendment 18.5, adopted by Council in November 2023, plans the Yonge Street and Carrville/16th Avenue Key Development Area, which York Region's 2022 Official Plan places within the protected major transit station areas of the 16th-Carrville, Bantry-Scott and Weldrick BRT stations, for higher-density residential, commercial, community and office uses, with non-residential space on the ground floor of new buildings and at least 15% of new floor area kept non-residential over the long term.

    Source: richmondhill.ca

Typical project environments

Typical project types

  • Medical & Professional
  • Commercial Fit-Outs
  • Institutional Facilities
  • Multi-Residential Projects
  • Office Renovations
  • Occupied-Building Work

Engineering services in Richmond Hill

Starting a project in Richmond Hill

Who issues building permits in Richmond Hill?

Building permits are handled by the Building Services Division of the City's Planning and Regulatory Services. All types of residential and non-residential building permit applications can be made online through the City's Permit Portal, starting with a pre-screening step followed by a formal application. Please confirm current requirements on the City's Building Permits page.

What mechanical and electrical drawings does Richmond Hill's Part 3 permit checklist ask for?

The City's Part 3 Permit Application Process checklist (C1) asks for P.Eng.-stamped mechanical drawings covering HVAC duct design, heat loss and heat gain calculations and plumbing and drain layouts, and electrical drawings covering lighting, power, emergency lighting, exit signs and fire alarm risers, along with sprinkler drawings. The City's Non-Residential Permits page also lists a Mechanical Unit Data Sheet that the design engineer fills out for every rooftop unit installation. Please confirm current requirements on the City's Non-Residential Permits page.

What site plan steps come ahead of an ICI building permit in Richmond Hill?

By-law 38-25, as amended by By-law 114-25, makes all of Richmond Hill a Site Plan Control Area, and new construction and additions or modifications to industrial, commercial, institutional and mixed-use developments fall under site plan control, with a Pre-Submission Meeting with Planning staff encouraged before an application. The City's Part 3 checklist lists an executed Site Plan Agreement, where applicable, among the pre-approvals required at the time of the building permit application. Please confirm current requirements on the City's Site Plan and Site Plan Amendments page.

Can ETEM support both electrical and mechanical engineering for a project in Richmond Hill?

Yes. ETEM can define the electrical and mechanical workstreams the actual scope requires. Each discipline's drawings are prepared and sealed by a licensed engineer, and shared loads, rooms, controls and construction interfaces are reviewed through one project workflow.