1. Request
Send the documents, the design basis, where the work will be used and your deadline.
- A confirmation of what we received
- Questions on anything missing
ETEM Engineering Inc. reviews and seals electrical and mechanical engineering documents for use in Ontario: drawings, calculations, and equipment or component packages from out-of-province manufacturers and contractors. It also peer-reviews tender packages for condominium boards and property managers. The firm holds Professional Engineers Ontario Certificate of Authorization 100682041.
In Ontario, a seal signifies that the engineer assumes professional responsibility for the documents. We review the documents, raise comments, and seal only when the comments are resolved.
Professional Engineers Ontario’s guideline on the use of the seal puts it plainly: “The seal on engineering documents signifies that a practitioner assumes professional responsibility for the specified intent of the documents.”
Sources: PEO, Use of the Professional Engineer’s Seal (2022); R.R.O. 1990, Reg. 941, s. 53; Professional Engineers Act, s. 12(2).
Every review follows the same four steps; the number of comment rounds depends on the documents.
Send the documents, the design basis, where the work will be used and your deadline.
A fixed scope and fee for the review, based on the documents and the codes involved.
We check the documents against the design basis and the Ontario requirements that apply, and issue written comments.
Once the comments are resolved, the final documents are sealed, signed and dated by a licensed professional engineer.
| Document type | What we check |
|---|---|
| Electrical drawings and calculations | Design basis, load and fault calculations, protection, and compliance with the Ontario Electrical Safety Code |
| Mechanical drawings and calculations | Heating and cooling loads, ventilation, equipment selection and compliance with the Building Code requirements that apply |
| Equipment and component packages | Ratings, the standards the equipment is built and certified to, and the connection to the Ontario installation |
| Tender packages | Completeness for pricing, code compliance, coordination between disciplines, phasing and commissioning requirements |
| Permit drawings | What the municipality and the authority having jurisdiction ask for, before the submission |
For condominium boards and property managers, a peer review checks a tender package before it goes out; see what that covers in our boiler replacement guide. When a seal is needed at all is explained in when you need a P.Eng. stamp.

400–4,000 A service entrance design
Utility metering configurations, transformer sizing, switchgear specification and coordination with Toronto Hydro, Alectra and Hydro One connection processes.

Key systems: Capacity assessment, Panel upgrades, Arc flash
Electrical capacity assessments, service entrance evaluations, distribution panel upgrades and arc flash hazard analysis, with P.Eng.-stamped coordination studies.

Key systems: RTU replacement, BAS integration, VFDs
Electrical design for rooftop unit replacements, boiler controls, BAS integration, VFD installations and dedicated mechanical equipment circuits, aligned with the mechanical scope.
With these, we can confirm the scope and send a fee proposal.
Yes, after review. PEO’s guideline allows a practitioner to seal documents prepared by others if the practitioner reviews and accepts responsibility for their engineering content, and says practitioners must never seal documents they have had no part in preparing or reviewing.
Official source:PEO, Use of the Professional Engineer’s Seal (2022)
Practising engineering in Ontario generally needs a licence issued by PEO. PEO offers a temporary licence to engineers licensed elsewhere in Canada for a specific project, and a firm serving the public also needs a Certificate of Authorization. A review and seal by an Ontario firm is the other route.
Official source:PEO, Apply for a temporary licence
No. PEO states that the seal is not a certification mark or warranty of correctness; it signifies that the engineer assumes professional responsibility for the documents. That is why we review before we seal.
Official source:PEO, Use of the Professional Engineer’s Seal (2022)