ETEM Engineering Inc. reviews and seals electrical and mechanical engineering documents for use in Ontario: drawings, calculations, and equipment or component packages from out-of-province manufacturers and contractors. It also peer-reviews tender packages for condominium boards and property managers. The firm holds Professional Engineers Ontario Certificate of Authorization 100682041.

In Ontario, a seal signifies that the engineer assumes professional responsibility for the documents. We review the documents, raise comments, and seal only when the comments are resolved.

What sealing means in Ontario

Professional Engineers Ontario’s guideline on the use of the seal puts it plainly: “The seal on engineering documents signifies that a practitioner assumes professional responsibility for the specified intent of the documents.”

  • Who may seal: holders of a licence, a temporary, provisional or limited licence, or a Certificate of Authorization issued in Ontario; the practitioners taking professional responsibility for the work seal the documents.
  • What is sealed: under Regulation 941, a practitioner signs, dates and seals an engineering document whose engineering content they prepared, or for which they otherwise assume responsibility; incomplete or draft documents are not sealed.
  • Not a rubber stamp: the guideline says practitioners must never seal documents they have had no part in preparing or reviewing, and may seal documents prepared by others only after reviewing them and accepting responsibility for their engineering content.
  • The firm: under the Professional Engineers Act, engineering services are offered to the public only under a Certificate of Authorization; ours is No. 100682041.

Sources: PEO, Use of the Professional Engineer’s Seal (2022); R.R.O. 1990, Reg. 941, s. 53; Professional Engineers Act, s. 12(2).

How it works

Every review follows the same four steps; the number of comment rounds depends on the documents.

1. Request

Send the documents, the design basis, where the work will be used and your deadline.

  • A confirmation of what we received
  • Questions on anything missing

2. Fee proposal

A fixed scope and fee for the review, based on the documents and the codes involved.

  • Scope of the review
  • Fee and payment terms

3. Review and comments

We check the documents against the design basis and the Ontario requirements that apply, and issue written comments.

  • A comment log
  • Marked-up drawings where useful
  • Further rounds until resolved

4. Seal

Once the comments are resolved, the final documents are sealed, signed and dated by a licensed professional engineer.

  • Sealed documents
  • The final comment log

What we review

Document typeWhat we check
Electrical drawings and calculationsDesign basis, load and fault calculations, protection, and compliance with the Ontario Electrical Safety Code
Mechanical drawings and calculationsHeating and cooling loads, ventilation, equipment selection and compliance with the Building Code requirements that apply
Equipment and component packagesRatings, the standards the equipment is built and certified to, and the connection to the Ontario installation
Tender packagesCompleteness for pricing, code compliance, coordination between disciplines, phasing and commissioning requirements
Permit drawingsWhat the municipality and the authority having jurisdiction ask for, before the submission

For condominium boards and property managers, a peer review checks a tender package before it goes out; see what that covers in our boiler replacement guide. When a seal is needed at all is explained in when you need a P.Eng. stamp.

Codes, approvals and standards

  • PEOSeal and Certificate of Authorization
  • Reg. 941Use of the seal
  • OESCElectrical installations
  • OBCBuilding permits
  • CSAEquipment standards

Typical projects

All projects
  • Commercial · Electrical

    Commercial Service Entrance & Utility Coordination

    400–4,000 A service entrance design

    Utility metering configurations, transformer sizing, switchgear specification and coordination with Toronto Hydro, Alectra and Hydro One connection processes.

  • Institutional · Electrical

    Institutional Power Distribution & Panel Modernization

    Key systems: Capacity assessment, Panel upgrades, Arc flash

    Electrical capacity assessments, service entrance evaluations, distribution panel upgrades and arc flash hazard analysis, with P.Eng.-stamped coordination studies.

  • Institutional · Electrical

    Building Envelope & HVAC Electrical Coordination

    Key systems: RTU replacement, BAS integration, VFDs

    Electrical design for rooftop unit replacements, boiler controls, BAS integration, VFD installations and dedicated mechanical equipment circuits, aligned with the mechanical scope.

Related guides

Knowledge Hub

What we need from you

With these, we can confirm the scope and send a fee proposal.

  • The documents, in editable form or as PDF
  • The design basis and the codes and standards the work was designed to
  • The site, or the province, where it will be used
  • Your deadline

Frequently asked questions

Can you seal drawings prepared by someone else?

Yes, after review. PEO’s guideline allows a practitioner to seal documents prepared by others if the practitioner reviews and accepts responsibility for their engineering content, and says practitioners must never seal documents they have had no part in preparing or reviewing.

Our engineer is licensed in another province. Can they seal for Ontario?

Practising engineering in Ontario generally needs a licence issued by PEO. PEO offers a temporary licence to engineers licensed elsewhere in Canada for a specific project, and a firm serving the public also needs a Certificate of Authorization. A review and seal by an Ontario firm is the other route.

Is a seal a guarantee that the design is correct?

No. PEO states that the seal is not a certification mark or warranty of correctness; it signifies that the engineer assumes professional responsibility for the documents. That is why we review before we seal.